Mactan Cebu International Airport Terminal 2 Construction

Client: MGCJV (a Joint Venture between Megawide and GMR)

FIMI was engaged by the MGC Joint venture at Mactan Cebu International Airport Terminal 2 to assist in achieving total utilization of restricted areas during the road construction stage.

FIMI applied Reinforced Earth’s MSE Wall technology enabling the construction of retaining walls, either single or tiered, supporting the access ramps which provides solutions to complex situations such as restricted right-of-way, unstable natural slopes, marginal foundation conditions and large settlements. This technique was adopted after a suggested design change by FIMI with MGCJV in which it was realized the precast MSE Walls were a more cost effective and efficient alternative to the proposed cast insitu retaining walls. The precast panels can be enhanced by customizing additional aesthetical features with specific treatments.

FIMI’s engagement is expected to be until December 2017.