THE EDADES SUITES
Construction|October 10, 2017FIMI has been awarded as the specialized subcontractor for the post-tensioning works in THE EDADES SUITES, Rockwell, Makati City. The project is consisting of eighteen (18) levels of post-tensioned flat slab which will start from the 5th floor up to the 24th floor, using Freyssinet’s internationally-recognized flat anchorage system utilizing 15.24mm diameter pre-stressed concrete (PC) strands.
UPDATE: Strengthening of Thales Tower in Tagaytay City
Repair|September 06, 2017With the proposed installation of the Radome at Tagaytay Radar Control Tower by Thales on behalf of Civil Aviation Authority Philippines, a need was identified to strengthen the tower against Typhoon winds of over 320km/hr.
Cebu IT Park: Mixed Use Development
Construction|September 05, 2017Cebu IT Park is a 27 Hectare IT economic zone and modern trading hub. Home to over a hundred IT companies and related services, Cebu IT Park is host to over 70 percent of Cebu’s business process outsourcing (BPO) industry.
Mactan Cebu International Airport Terminal 2 Construction
Construction|September 04, 2017FIMI was engaged by the MGC Joint venture at Mactan Cebu International Airport Terminal 2 to assist in achieving total utilization of restricted areas during the road construction stage.
Runway Manila
News|May 10, 2017The much anticipated iconic Runway Manila has been opened officially to the public on April 2017, free of charge, connecting the Newport Boulevard with the second level of NAIA Terminal 3.
Design and Engineering for Pre-Heater Tower Structural Assessment
Repair|February 16, 2017FIMI is leading the activities for the structural investigation, analysis, and design for the structural repair solutions on Republic Cement’s pre-heater towers in Norzagaray, Bulacan. This venture is in partnership with R.A. Flordeliza Engineering Consultancy (RAFEC).